Checkpoint that the real FMA transfer is now beyond the three-quarter mark
Constraint: The ongoing Ralph loop still needs concrete operational evidence while the real-data path remains blocked on bytes, not logic. Rejected: Waiting for a round-number milestone like eighty percent | The current progress jump is already material and verified. Confidence: high Scope-risk: narrow Directive: Continue capturing substantial progress and guard-runtime evidence until the archive completes and the phase can change. Tested: Verified the detached guard remained alive for more than six minutes, confirmed log growth through thirteen polling cycles, re-ran archive inspect, and confirmed readiness is still blocked only by incomplete bytes. Not-tested: Extraction and real-data smoke remain pending until archive completion.
Showing
1 changed file
with
216 additions
and
0 deletions
-
Please register or sign in to post a comment